Table 3-5 - Noise Levels Generated by Construction Activities

CONSTRUCTION ACTIVITY
NOISE LEVEL AT 50 FEET (15 METERS) DB(A) LMAX
NOISE LEVEL AT 50 FEET (15 METERS) DB(A) LEQ
 
Solar Field and Power Collections Systems
Install BMP Measures (Part of Site Preparation)
75.0
71.3
 
Site Preparation (Solar Block Arrays)
85.0
83.6
 
Site Preparation (Roads)
85.0
82.3
 
Install Fencing
75.0
71.3
 
Install Tracking System Posts
84.4
78.3
 
Install Support Structures
75.0
71.3
 
Install Inverters and Switchgear & Sub-Structure
80.6
76.1
 
Direct Current (DC) and Alternating Current (AC) Cable Installation (Underground)
80.7
78.4
 
DC and AC Cable Installation (Above-Grade)
75.0
71.3
 
Module Installation
75.0
71.3
 
Fire Protection
80.9
80.8
 
O&M Building
74.7
68.3
 
Substation
Steel Structures
80.6
73.8
 
Insulators, Bus, and Electrical Equipment
80.6
73.8
 
Control Wiring
80.6
74.9
 
Cleanup
85.0
82.7
 

Table 3-6 Noise Levels Generated by Operation and Maintenance Activities

SOURCE
NOISE LEVEL AT 50 FEET (15 METERS) DB(A) LEQ
Maintenance
Pickup truck
71
Solar Panels and Substations
Tracker
41
Inverter 1 MW
51
Transformer 2 MW
42

Source both tables: (DOI BLM, 2019)